麻豆入口

Why Every Mechanical Contractor Needs A Change Order Communication Tool

Change Orders represent a considerable risk for HVAC & mechanical contractors. They can drain cash and strain relationships with GCs. Between 5% and 30% of total project revenue is at risk.

Article content provided by Clearstory.

Clearstory HeroClearstory bridges this gap with a purpose-built Change Order communication tool. Our cloud-based solution provides: 

  • Real-time collaboration: A shareable Change Order Log keeps everyone aligned, eliminating confusion and surprises.
  • Streamlined processes: Digital T&M Tags, instant pricing, and COR templates accelerate processing time.
  • Increased transparency: Provides a clear history of documentation, revisions, and approvals, fostering trust with GCs.

With Clearstory, HVAC and mechanical contractors can reduce revenue risk, improve cash flow, and boost team productivity. Ready to close the Change Order gap? Contact us for a demo today.

Visit the .

Have a question for Clearstory? Contact Clearstory .

Clearstory鈥檚 mission is to make the entire construction industry more efficient by helping teams get extra work processed and closed faster to reduce risk, waste less time, and improve relationships. Our solutions make one of the country鈥檚 biggest industries a more fun and inspiring place to work.

 


Mar 25, 2025 Products & Services Update

Latest Articles


AI-Powered Insights to Find Answers

Apr 23, 2025 - Construction professionals currently spend 18% of their time searching for information on projects, relying on keyword searches and sifting through countless results to find answers.


Amplify Your Return on Investment with the Lockformer Spiral Tube Former 2.0

Apr 23, 2025 - Lockformer Spiral Tube Former 2.0 is compact and fast, forming 3鈥100鈥 pipe at up to 344 FPM. With Spiral Smart Tech, on-the-fly slitting and trailer-ready design, it ensures quiet, precise production.


The Most Productive Way to Shear Strut on Site

Apr 23, 2025 - Designed for electricians, plumbers, and mechanical contractors, Milwaukee Tool's M18鈩 FORCE LOGIC鈩 Single Channel Strut Shear delivers precise measurements, consistent accuracy, and installation-ready cuts with no exposed blades.